Calculate your Savings
This is an example of what one customer saved by switching to Paylode®.
Input the four numbers below to compare your operations.
Current One-way-trip dunnage costs
Net annual cost of disposable dunnage:
$1,325,000
Projected** costs with Paylode®
Corresponding once-off capital cost of Paylode® equipment is:
$905,730
Annual return logistics costs for Paylode® are:
$198,750
Damage cost reduction with Paylode®:
$-7,500
Improvement in loading time (1 hour per car @$15):
$-75,000
Net Annual costs with Paylode®:
$116,250
NET SAVINGS PER YEAR WITH Paylode®
$1,208,750
You get your investment back after
9 months
And then continue to save
$1,208,750 every year
Tons of waste not going to landfill (assumed 175 lbs. per car/truck)
437.5 Tons per year
** Above projections are based on typical cost structure. Please contact us for a detailed analysis which we will prepare for your operations.